The Finishing Touch

Today Mrs Fogg and I fitted the gym mirror (1.48m x 1.3m weighting 28kg). We built a made to measure frame to support the beastie. A good team effort that finishes the Fogg’s Body Shop off nicely.

At last we finish

Ooh today we finished the gym shed. It looks amazing and I’m super proud of Mr Fogg who has toiled for the past fortnight to get all the walls done.

I finished it today by laying the flooring and we manoeuvred all the kit in. Plenty of floor space, dry and insulated, I’m so excited to try it!

Well done Mr Fogg!

And for a tally up we have used;

  • 15sqm of 12mm floor boards
  • 187, 3m spruce tongue and groove cladding
  • 20m of beading
  • 40.5 of 40mm insulation
  • 1.300 4x25mm screws
  • 70 nails
  • 50, 10mm flooring
  • 4 shelves
  • 4 USB Power Outlets
  • 2, 120w heaters
  • 1 ultra bright LED strip light
  • 6ltr of paint
  • 96hrs of blood, sweat and sweating!

Next up, fitting the 28kg 1.82sqm mirror

New Broom Sweeps Clean

It’s autumn and the leaves are falling, even after we chopped half the trees down. For the last 2 years it’s taken days to rake them all up, so this year I decided to go semi hi tech and buy a lawn sweeper to pull along behind the tractor. Mrs Fogg decided since it’s an attachment for her ride on mower that she would sweep them all up. Yet another toy I don’t get to play with.